  1. Objective:

To lay down the procedure for Operation, Cleaning and Calibration of Water Bath.

 

  1. Scope:

This SOP is applicable for Operation, Cleaning and Calibration of Water Bath located in Quality Control Laboratory.

  1. Responsibility:
  • Quality Control: To prepare and review the SOP. To follow the procedures laid down for operation, cleaning and calibration of Water Bath as per this SOP.
  • Engineering Department: To carry out preventive maintenance as per schedule and procedure defined.
  • Quality Assurance Department: To review and approve the SOP and Annexures.

  

  1. Accountability:

Head Quality Control Department, Head Quality Assurance Department

  1. Procedure:

 

    5.1 Safety Precautions/Instructions:
5.1.1 Ensure all the electrical connections are properly earthed. Ensure the power plug of the water bath is fixed in the socket properly.  
5.1.2 Wear personal protective equipments such as safety glasses, hand gloves during operation of instrument.  
5.1.3 Ensure that the ON/OFF switch is working properly by switching “ON” the water bath.             
5.2 Operation:
5.2.1 Check the validity of calibration before starting any operations.  
5.2.2 Ensure that the equipment should be cleaned before operation.  
5.2.3 Fill the water bath with sufficient purified water (i.e.  2/3 of its capacity).  
5.2.4 Switch ON the ON/OFF knob provided on the water bath.  
5.2.5 Close all the rings which will facilitate the boiling faster.  
5.2.6 The  lid  has  got  six  holes  which  can  be  closed  and  opened  by  means  of  ring.  
5.2.7 Maintain the required temperature of the water bath with the help of temperature knob provided on the water bath.  
5.2.8 Red light on the “Thermostat indicator” and “Line indicator” will glow when the required temperature is reached.  
5.2.9 Ensure that the heater of the bath is immersed below the water level.  
5.2.10 Open the rings and place the sample on the water bath for heating.  
5.2.11 Refill the purified water in the water bath if the water level is decreased.  
5.2.12 Use only purified water to refill water bath.  
5.2.13 Switch OFF the mains of the instrument after heating is over.  
    5.3 Cleaning Procedure:
5.3.1 Drain the purified water and clean the water bath thrice in a week.  
    5.4 Calibration Procedure:
  Frequency:  Once in a year
5.4.1    Calibration is carried out by external agency as per SOP  
5.4.2 Refer Annexure for calibration test to be performed and acceptance criteria.

Sr. No. Tests Set value Acceptance Criteria
1.  

Temperature Verification

50oC ±5oC
100oC ±5oC
 
5.4.3 Generate the A. R. No. on the “Instrument/Equipment Calibration Register” as per SOP number and give requisition to QA department for calibration formats of instruments on the due date of calibration.  
5.4.4 For issuance of calibration report refer QA SOP.  
5.4.5 If any breakdown occurs, follow procedure as per SOP “Calibration of Instruments and Equipments”.  

 

 

  1. Definitions / Abbreviations:
  • Definitions:
  • Breakdown: Any activity leading to operation of instrument/equipment other than the set parameters and/ or unusual sound or vibration observed in the instrument/equipment.
  • Calibration: Tests performed to ensure that the instrument/equipment is functioning as per set parameters. These tests are performed as per predefined frequency and also after any major repair or replacement of parts.

  

  • Abbreviations:
Abbreviation Expansion
SOP Standard Operating Procedure
QC Quality Control
QA Quality Assurance

 

No. Number
A. R. No. Analytical Reference Number
i.e. That is

  

*Note – Ready to use SOP available in “DOWNLOAD” Section.

 

Leave a Reply

Your email address will not be published. Required fields are marked *

error: Content is protected !!