SOP Title: Operation, Cleaning and Calibration of Vacuum Pump

SOP Title: Operation, Cleaning and Calibration of Vacuum Pump

 

  1. Objective:

To lay down the procedure for Operation, Cleaning and Calibration of Vacuum Pump.

  1. Scope:

This SOP is applicable for Operation, Cleaning and Calibration of Vacuum Pump located in Quality Control Laboratory

  1. Responsibility:
  • Quality Control: To prepare and review the SOP. To follow the procedures laid down for Operation, Cleaning and Calibration of Vacuum Pump as per this SOP.
  • Engineering Department: To carry out preventive maintenance as per schedule and procedure defined.
  • Quality Assurance Department: To review and approve the SOP and Annexures.
  1. Accountability:

Head Quality Control Department, Head Quality Assurance Department

  1. Procedure:

 

     5.1 Safety Precautions/Instructions:
5.1.1 Ensure all the electrical connections are properly earthed. Ensure the power plug of the vacuum pump is fixed in the socket properly.  
5.1.2 Wear personal protective equipments such as safety glasses during operation of equipment.  
5.1.3 Ensure that the ON/OFF switch is working properly by switching “ON” the vacuum pump.             
5.2 Operation:
5.2.1 Check the validity of calibration before starting any operations.  
5.2.2 Ensure that the equipment should be cleaned before operation.  
5.2.3 Connect the vacuum pump tube to the filtration assembly.  
5.2.4 Pour the solution to be filtered into the filtration assembly.  
5.2.5 Switch ON the main switch of the equipment.  
5.2.6 After completion of filtration put ‘OFF’ the main switch.  
5.2.7 Disconnect the vacuum pump tube from the filtration assembly.  
5.3 Cleaning Procedure:
5.3.1 Clean the vacuum pump with lint free cloth before and after use.  
   5.4 Calibration Procedure:
  Frequency:  Once in a year
5.4.1       Calibration is carried out by external agency as per SOP number QC/009 “Calibration of Instruments and Equipments”.  
5.4.2 Refer Annexure for calibration test to be performed and acceptance criteria.

Sr. No. Tests Set value Acceptance Criteria
1. Pressure Verification of vacuum gauge 0 inHg ± 2 %
– 5 inHg  ± 2 %
– 10 inHg ± 2 %
– 15 inHg ± 2 %
– 20 inHg ± 2 %
– 25 inHg ± 2 %
 
5.4.3 Generate the A. R. No. on the “Instrument/Equipment Calibration Register” as per SOP and give requisition to QA department for calibration formats of equipments on the due date of calibration.  
5.4.4 For issuance of calibration report refer SOP “Control of documents, Preparation, Approval, Issuance and Maintenance.  
5.4.5 If any breakdown occurs, follow procedure as per SOP.  
5.4.6 If preventive maintenance activity is outsourced, the observations are to be transcribed in the Annexure, and external party certificate to be attached.  

  

  1. Definitions / Abbreviations:
  • Definitions:
  • Breakdown: Any activity leading to operation of instrument/equipment other than the set parameters or unusual sound or vibration observed in the instrument/equipment.
  • Calibration: Tests performed to ensure that the instrument/equipment is functioning as per set parameters. These tests are performed as per predefined frequency and also after any major repair or replacement of parts.
  • Preventive Maintenance: Maintenance activity performed to ensure that the instrument/equipment will function smoothly and to avoid breakdowns. These activities are performed as per predefined frequency.

 

  • Abbreviations:
Abbreviation Expansion
No. Number
A. R. No. Analytical Reference Number

*Note – Ready to use SOP available in “DOWNLOAD” Section.

 