SOP Title: Procedure for Fumigation in Microbiology Section

SOP Title: Procedure for Fumigation in Microbiology Section

  1. Objective:

To lay down the Procedure for Fumigation in Microbiology Section of Quality Control Department.

 

  1. Scope:

This procedure is applicable for the Procedure of Fumigation in Microbiology Section of Quality Control Department.

 

  1. Responsibility:
    • Quality Control Department: To prepare and review the SOP. To follow the procedures for

Fumigation in Microbiology Section as per this SOP.

  • Quality Assurance Department: To review and approve the SOP and Annexure.

 

  1. Accountability:

Head Quality Control Department,  Head Quality Assurance Department.

 

  1. Procedure:
    5.1 Safety Precautions/Instructions:  
5.1.1 AHU and air conditioners should be switched OFF before proceeding with the Fumigation Activity.  
5.1.2 The person, handling the fumigants, shall be thoroughly familiar with application, procedures, safety equipment, first-aid treatment, and disposal procedures.  
5.1.3 Person performing Fumigation Activity should leave the area immediately.  
5.1.4 No one should enter the fumigated area for at least 8 to 10 hrs after Fumigation or until the completion of the Fumigation Activity.  
    5.2 Fumigation Procedure:
5.2.1 Switch OFF the AHU.  
5.2.2 If the LAF is ON, put it OFF before starting the Activity.  
5.2.3 All the Materials, Equipments shall be removed or covered.  
5.2.4 Wear safety hand gloves and nose mask.  
5.2.5 Weigh and transfer about 5gm of Potassium Permanganate in a container or an evaporating dish.  
5.2.6 Measure about 50 ml volume of Formaldehyde solution 37% w/v in the measuring cylinder and add to the weighed quantity of Potassium Permanganate powder.  
5.2.7 Personnel who perform Fumigation Activity should leave the area being fumigated as soon as possible.  
5.2.8 Entrance of the Fumigated area must be labelled as “FUMIGATION IN PROGRESS – DO NOT ENTER” as per Annexure.  
5.2.9 At the end of the Fumigation period or after minimum 8-10 hrs of Fumigation, remove Formaldehyde pans or containers.  
5.2.10 Switch ON the Air conditioner or AHU and run it for 30 minutes, prior to entering this area.  
5.2.11 Dissolve the left over residue from the evaporating dish or container in about 500 ml of raw water & transfer the contents in the container labelled as ‘Chemical Waste’ and send it for disposal.  
5.2.12 The area and equipments should be cleaned and disinfected as per SOP ‘Procedure for Area Cleaning and Sanitation of Microbiological section’.  
5.2.13 Update the Fumigation record as per Annexure.  
5.2.14 Frequency – Weekly once, preferably on Saturday or prior to a holiday, at the end of the shift.  
 
  1. Definitions / Abbreviation:
  • Definitions:
  • Abbreviation:
Abbreviation Expansion

 

AHU Air Handling Unit
      LAF Laminar Air Flow
% percentage
ml millilitre
hrs hours
g gram
w/v Weight by volume

  