Categories
QC SOP

SOP Title-Operation of Ultrasonic Bath

SOP Title-Operation of Ultrasonic Bath

 

  • OBJECTIVE

To lay down a procedure for operation of Ultrasonic Bath.

  • SCOPE

This SOP is applicable for operation of Ultrasonic Bath located at Quality Control laboratory.

  • RESPONSIBILITY
  • QC Personal shall be responsible for implementation of procedure.
  • QC Head shall be responsible for compliance of this procedure.

 

  • PROCEDURE
    • Operation Procedure:
  • Precautions:
  • Never run the Sonicator without water.
  • Never run the Sonicator more than 30 minutes
  • Replace water daily to avoid growth of micro-organisms and turbidity in the bath.
  • Check the proper Earthing of the Sonicator.
  • Never operate the instrument without water in the tank..
  • Never dip fingers in the tank when it is in operation.
  • Operation Procedure:
  • Check the proper Earthing of the Sonicator.
  • Switch “ON” the mains power supply of the instrument.
  • Press down arrow to set the desired time for degassing & then press ‘START’ button.
  • If heating is required, Switch on the heater of instrument.
  • Keep the glassware containing sample for Sonication in the Sonicator bath and put ON switch.
  • After completion of the “set time” it will automatically stop, put OFF the ultrasonic bath by putting off the switch.
  • Cleaning:
  • Daily clean the instrument with clean and dry lint free cloth to remove the dust.
  • Drain-off the water from the Tank whenever water becomes Hazy.
  • Clean the tank with water.

 

  • ABBREVIATION(s)
Abbreviation  Full Description 
SOP Standard Operating Procedure
QC Quality Control

 

*Note – Ready to use SOP available in “DOWNLOAD” Section.

 

Leave a Reply

Your email address will not be published. Required fields are marked *

error: Content is protected !!