SOP Title-Operation of Pin Hole Tester
- OBJECTIVE
To lay down a procedure for operation of Pin Hole Tester.
- SCOPE
This SOP is applicable for operation of Pin Hole Tester located at Quality Control laboratory.
- RESPONSIBILITY
- QC Personal shall be responsible for implementation of procedure.
- QC Head shall be responsible for compliance of this procedure.
- DEFINITION(s)
Not Applicable
- PROCEDURE
- Operation Procedure
- Ensure the cleanliness of the instrument.
- Switch on the main power supply.
- After glowing the light, Wait for 5 minutes to get full glow of light in chamber.
- Examine the testing PVC/Blister foil by keeping on the surface of the instrument for any pin holes on the sample through naked eyes.
- Switch off the main power supply.
- After Completion record the operation activity as per format.
- Cleaning:
- Daily clean the Instrument with clean and dry cloth.
- ABBREVIATION(s)
Abbreviation | Full Description |
SOP | Standard Operating Procedure |
QC | Quality Control |
PVC | Poly Vinyl Chloride |
*Note – Ready to use SOP available in “DOWNLOAD” Section.