SOP Title: Operation, Cleaning and Calibration of Bursting Strength Apparatus

SOP Title: Operation, Cleaning and Calibration of Bursting Strength Apparatus

  1. Objective:

To lay down the procedure for Operation, Cleaning and Calibration of Bursting Strength Apparatus.

 

  1. Scope:

This SOP is applicable for Operation, Cleaning and Calibration of Bursting Strength Apparatus located in Quality Control Laboratory.

 

  1. Responsibility:
  • Quality Control: To prepare and review the SOP. To follow the procedures laid down for Operation, Cleaning and Calibration of Bursting Strength Apparatus as per this SOP.
  • Engineering Department: To carry out preventive maintenance as per schedule and procedure defined.
  • Quality Assurance Department: To review and approve the SOP and Annexures.

 

  1. Accountability:

Head Quality Control Department, Head Quality Assurance Department

 

  1. Procedure:
    5.1 Safety Precautions/Instructions:
5.1.1 Ensure all the electrical connections are properly earthed. Ensure the power plug of the Bursting Strength Apparatus is fixed in the socket properly.  
5.1.2 Wear personal protective equipments such as safety glasses during operation of instrument.  
5.1.3 Ensure that the ON/OFF switch is working properly by switching “ON” the Bursting Strength Apparatus.             
5.2 Operation  Procedure:
5.2.1 Check the validity of Calibration before starting any operations.  
5.2.2 Introduction to the Keys:

MAIN ON:  ON/OFF switch.

PUSH FOR BRUST: Press button to apply pressure for bursting.

GAUGE I (Left side): To select the pressure gauge 0 to 8.0 kg/cm2.

GAUGE II (Right side):  To select the pressure gauge 0 to 40.0 kg/cm2.

 
5.2.3 Switch ON the main switch and “MAINS ON” switch of the instrument.  
5.2.4 Raise the tripod and upper clamping by rotating clamp wheel.  
5.2.5 Place the representative sample of the material to be analysed over the diaphragm between the upper and lower clamping plates.  
5.2.6 Lower the tripod plate applying sufficient clamping pressure to prevent slip of the sample between lower and upper clamping plates during analysis.  
5.2.7 While analysing corrugated board, it is recommended that tripod plate be lowered to position where it rests on top of the sample.  
5.2.8  Select the GAUGE I or GAUGE II depending up on the strength of sample by moving the lever.  
5.2.9 If bursting strength of the sample is below 8.0 kg/cm2, then turn the lever to GAUGE I.  
5.2.10 If bursting strength of the sample is above 8.0kg/cm2, then turn the lever to GAUGE II.  
5.2.11 Set the needle pointer of the gauge at zero position.  
5.2.12 Push the “PUSH FOR BURST” button and keep it pressed so that plunger will start rotating in clock wise direction at constant speed till sample bursts.  
5.2.13 Release pressed push button as soon as the sample bursts.  
5.2.14 Record the bursting strength at which the needle pointer on the gauge stops when the sample bursts.  
5.2.15 This will automatically reverse the direction of plunger, and it will come and stop to its starting position.  
5.2.16 The motor will stop at this position.  
5.2.17 Update the “Instrument/Equipment Usage Log Book” as per SOP No. QC/009 “Calibration of Instruments and Equipments”.  
     5.3 Cleaning Procedure:
5.3.1 After completion of the test clean the plunger with lint free nylon cloth.  
    5.4 Calibration Procedure:  
  Frequency:  1) Once in a year by external agency.  
  2) In-house calibration to be performed half yearly or after carrying out any major maintenance work.  
5.4.1 For external calibration refer Annexure for calibration test to be performed and acceptance criteria.

Sr. No. Tests Set value Acceptance Criteria
1. Pressure Verification of Pressure

Gauge – Ι

 

0.0 Kg/cm2 ± 2 %
2.0 Kg/cm2 ± 2 %
4.0 Kg/cm2 ± 2 %
6.0 Kg/cm2 ± 2 %
8.0 Kg/cm2 ± 2 %
2. Pressure Verification of Pressure

Gauge – ΙΙ

 

0.0 Kg/cm2 ± 2 %
10.0 Kg/cm2 ± 2 %
20.0 Kg/cm2 ± 2 %
30.0 Kg/cm2 ± 2 %
40.0 Kg/cm2 ± 2 %
 
5.4.2 Generate the A. R. No. on the “Instrument/Equipment Calibration Register” as per SOP and give requisition to QA department for calibration formats of instruments on the due date of calibration.  
5.4.3 For issuance of calibration report refer QA SOP “Control of documents, Preparation, Approval, Issuance and Maintenance.  
5.4.4 Perform the Inhouse calibration of instrument as per Annexure and procedure mentioned below.  
5.4.5 Calibration of bursting strength is performed by standard aluminium foil.  
5.4.6 Repeat the procedure from point 5.2.5 to point 5.2.16.  
5.4.7 Enter the details in calibration report as per Annexure. Ensure that the results obtained, comply with the acceptance criteria.

Sr. No. Parameters Acceptance Criteria

(As per Supplier Specification)

Observed Values Complies / Does Not Complies
1. Bursting Strength of

Standard Aluminium foil

     
   

 

 
 
5.4.8 Update the “Instrument/Equipment Usage Log Book” as per SOP “Calibration of Instruments and Equipments”.  
5.4.9 Affix the “Calibration Status Label” on the Instrument as per SOP “Calibration of Instruments and Equipments”.  
5.4.10 If calibration activity is outsourced, the values are to be transcribed in the Annexure, and external party certificate to be attached.  
5.5 Preventive Maintenance :
5.5.1 Perform the preventive maintenance and record in Annexure.  
5.5.2 If preventive maintenance activity is outsourced, the observations are to be transcribed in the Annexure and external party certificate to be attached.  
5.5.3 If any breakdown occurs, follow procedure as per “Calibration of Instruments and Equipments”.  
  1. Definitions / Abbreviations:
  • Definitions:
  • Breakdown: Any activity leading to operation of instrument/equipment other than the set parameters or unusual sound or vibration observed in the instrument/equipment.
  • Calibration: Tests performed to ensure that the instrument/equipment is functioning as per set parameters. These tests are performed as per predefined frequency and also after any major repair or replacement of parts.
  • Preventive Maintenance: Maintenance activity performed to ensure that the instrument/equipment will function smoothly and to avoid breakdowns. These activities are performed as per predefined frequency.

 

  • Abbreviations:
Abbreviation Expansion
SOP Standard Operating Procedure
QC Quality Control
QA Quality Assurance
Kg/cm2 Kilogram per centimetre square
PM Preventive Maintenance

 

*Note – Ready to use SOP available in “DOWNLOAD” Section.

 

Leave a Reply

Your email address will not be published. Required fields are marked *

error: Content is protected !!