SOP Title: Sanitization of PW Storage and Distribution System

SOP Title: Sanitization of PW Storage and Distribution System

  1. Objective:

To lay down a procedure for the Sanitization of PW Storage and Distribution System.

  1. Scope:

This procedure is applicable for the Sanitization of Purified Water Storage Tank and Distribution loop line at site.

  1. Responsibility:

3.1 Engineering Department: To prepare and review the SOP. To follow the procedure laid down   for the PW Storage and Distribution System as per this SOP.

3.2 Quality Assurance Department: To review and approve the SOP and Annexes. To ensure

compliance of the procedure.

 

  1. Accountability:

Head, Engineering Department / Head, Quality Assurance Department.

  1. Procedure:
    • Definitions:

5.1.1   Engineering Associate: Executive or Operator of Engineering Department trained to perform duties as per this SOP.

 

5.2.    Operational Procedure:              

  Safety Precautions/Instructions:
5.2.1 Wear appropriate Personal Protective Equipment while sanitization of   PW storage and distribution system.  
5.2.2 Check whether all the instruments in the line are under calibrated state and functioning properly.  
5.2.3 Ensure that the water level in the PW storage tank is at least 2/3 of the capacity.  
5.2.4 Check the operation of spray ball by opening the lid of PW storage tank.  
5.2.5 Inform the User Departments before sanitization of the system and close all the user points of PW during sanitization procedure.  
  Hot water sanitization of PW Storage and Distribution System:
5.2.6 Thermal approaches to system sanitization include periodic circulating of hot water at 80°C -85°C for 45 minutes.  
5.2.7 Start the boiler and open the steam valve to the PW water tank.  
5.2.8 Check the pressure of steam on the pressure gauge (should be maintained below 1.5 kg/cm2).  
5.2.9 Open the steam valve of the steam jacketed purified water tank.  
5.2.10 Wait till the temperature of the PW storage tank reaches to 80°C -85°C.  
5.2.11 Open the re-circulatory pump of the water system and circulate the hot water continuously for 45 minutes.  
5.2.12 After 45 minutes drain the hot water through all the users points for 10 minutes (i.e. till all the hot water gets drain out completely).  
5.2.13 Close all the user points of the loop and close the steam valve from the boiler.  
5.2.14 After completion of sanitization, intimate Quality Control Department to collect the purified water sample by sending “Water Sample Intimation Slip” as per Annexure to Quality Control Department.  
5.2.15 Water Sample Intimation Slip containing two copies (One original and one Carbon copy.  
5.2.16 After water sample analysis, Quality Control Department sends the carbon copy of “Water Sample Intimation Slip” with result to Engineering Department and original copy retains with Quality Control Department.  
5.2.17 Record the sanitization details in the prescribed format as mentioned in Annexure.  
5.2.18 Start the water system after receiving water analysis report satisfactory.  
  Frequency
5.2.19 Perform the Sanitization Procedure for Water System after every fortnightly.  

 

  1. Abbreviation:
Abbreviation Expansion
QAD Quality Assurance Department
EGD Engineering Department
°C Degree Celsius
PW Purified Water
NMT Not More Than
w.r.t. With Respect To

  