{"id":817,"date":"2025-06-14T17:02:58","date_gmt":"2025-06-14T17:02:58","guid":{"rendered":"https:\/\/pharmacoguide.com\/?p=817"},"modified":"2025-06-14T17:02:58","modified_gmt":"2025-06-14T17:02:58","slug":"sop-title-operation-cleaning-and-calibration-of-centrifuge-apparatus","status":"publish","type":"post","link":"https:\/\/pharmacoguide.com\/?p=817","title":{"rendered":"SOP Title: Operation, Cleaning and Calibration of Centrifuge Apparatus"},"content":{"rendered":"<p><strong><u>SOP Title:<\/u><\/strong> <strong><u>Operation, Cleaning and Calibration of Centrifuge Apparatus<\/u><\/strong><\/p>\n<ol>\n<li><strong>Objective:<\/strong><\/li>\n<\/ol>\n<p>To lay down the procedure for Operation, Cleaning and Calibration of Centrifuge Apparatus.<\/p>\n<p>&nbsp;<\/p>\n<ol start=\"2\">\n<li><strong>Scope:<\/strong><\/li>\n<\/ol>\n<p>This SOP is applicable for Operation, Cleaning and Calibration of Centrifuge Apparatus located in Quality Control Laboratory.<\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<ol start=\"3\">\n<li><strong>Responsibility:<\/strong><\/li>\n<\/ol>\n<ul>\n<li>Quality Control: To prepare and review the SOP. To follow the procedures laid down for Operation, Cleaning and Calibration of Centrifuge Apparatus as per this SOP.<\/li>\n<li>Engineering Department: To carry out preventive maintenance as per schedule and procedure defined.<\/li>\n<li>Quality Assurance Department: To review and approve the SOP and Annexures.<\/li>\n<\/ul>\n<p><strong>\u00a0<\/strong><\/p>\n<ol start=\"4\">\n<li><strong>Accountability:<\/strong><\/li>\n<\/ol>\n<p>Head Quality Control Department, Head Quality Assurance Department.<\/p>\n<p>&nbsp;<\/p>\n<ol start=\"5\">\n<li><strong>Procedure:<\/strong><\/li>\n<\/ol>\n<p><strong>\u00a0<\/strong><\/p>\n<table width=\"693\">\n<tbody>\n<tr>\n<td width=\"67\"><strong>\u00a0\u00a0\u00a0 5.1 <\/strong><\/td>\n<td colspan=\"2\" width=\"626\"><strong>Safety Precautions\/Instructions:<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"67\">5.1.1<\/td>\n<td width=\"608\">Ensure all the electrical connections are properly earthed. Ensure the power plug of the centrifuge apparatus is fixed in the socket properly.<\/td>\n<td width=\"19\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"67\">5.1.2<\/td>\n<td width=\"608\">Ensure that the ON\/OFF switch is working properly by Switching \u00a0\u201cON\u201d<\/p>\n<p>the centrifuge apparatus.<\/td>\n<td width=\"19\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"67\">\u00a0\u00a0\u00a0 <strong>5.2<\/strong><\/td>\n<td colspan=\"2\" width=\"626\"><strong>Operation:<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"67\">5.2.1<\/td>\n<td width=\"608\">Switch ON the main switch. Red light indicator on the equipment will glow.<\/td>\n<td width=\"19\"><strong>\u00a0<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"67\">5.2.2<\/td>\n<td width=\"608\">Open the lid of centrifuge apparatus.<\/td>\n<td width=\"19\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"67\">5.2.3<\/td>\n<td width=\"608\">Four-centrifuge tube stands are provided inside the equipment.<\/td>\n<td width=\"19\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"67\">5.2.4<\/td>\n<td width=\"608\">Check that the centrifuge tubes are clean and dry before pouring sample solution in it.<\/td>\n<td width=\"19\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"67\">5.2.5<\/td>\n<td width=\"608\">Put the centrifuge tube containing sample solution in the centrifuge apparatus.<\/td>\n<td width=\"19\"><strong>\u00a0<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"67\">5.2.6<\/td>\n<td width=\"608\">Ensure that the sample solution should not be more than 80% capacity of the centrifuge tube.<\/td>\n<td width=\"19\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"67\">5.2.7<\/td>\n<td width=\"608\">Place the centrifuge tubes in such positions that the opposite sides are balanced.<\/td>\n<td width=\"19\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"67\">5.2.8<\/td>\n<td width=\"608\">When using two centrifuge tubes they should be placed opposite to each other.<\/td>\n<td width=\"19\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"67\">5.2.9<\/td>\n<td width=\"608\">Turn the main knob to the \u20181\u2019 position in clockwise direction.<\/td>\n<td width=\"19\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"67\">5.2.10<\/td>\n<td width=\"608\">Instrument will start at low speed (1000 rpm). Then increase the speed to position 2 (2000 rpm), 3 (4000 rpm), 4 (8000 rpm), 5 (10000 rpm) or as required.<\/td>\n<td width=\"19\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"67\">5.2.11<\/td>\n<td width=\"608\">After completion, slowly decrease the speed on the knob and then finally bring to OFF position.<\/td>\n<td width=\"19\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"67\">5.2.12<\/td>\n<td width=\"608\">Open the lid of centrifuge machine, remove the centrifuge tube and check for satisfactory results.<\/td>\n<td width=\"19\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"67\">5.2.13<\/td>\n<td width=\"608\">Switch OFF the main switch after completion.<\/td>\n<td width=\"19\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"67\"><strong>5.3<\/strong><\/td>\n<td colspan=\"2\" width=\"626\"><strong>Cleaning Procedure:<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"67\">5.3.1<\/td>\n<td width=\"608\">Clean the centrifuge machine externally and internally with clean lint free cloth.<\/td>\n<td width=\"19\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"67\"><strong>5.4<\/strong><\/td>\n<td colspan=\"2\" width=\"626\"><strong>Calibration Procedure:<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"67\">&nbsp;<\/td>\n<td colspan=\"2\" width=\"626\"><strong>Frequency: <\/strong><strong>\u00a0<\/strong>Once in a year by external agency or after carrying out any major maintenance work.<\/td>\n<\/tr>\n<tr>\n<td width=\"67\">5.4.1<\/td>\n<td width=\"608\">Calibration is carried out by external agency as per SOP \u201cCalibration of Instruments and Equipments\u201d.<\/td>\n<td width=\"19\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"67\">5.4.2<\/td>\n<td width=\"608\">Refer Annexure for calibration test to be performed and acceptance criteria.<\/p>\n<table width=\"596\">\n<tbody>\n<tr>\n<td width=\"9%\"><strong>Sr. No.<\/strong><\/td>\n<td width=\"19%\"><strong>Tests<\/strong><\/td>\n<td width=\"18%\"><strong>Knob<\/strong><\/td>\n<td width=\"26%\"><strong>Set value<\/strong><\/td>\n<td width=\"26%\"><strong>Acceptance Criteria<\/strong><\/p>\n<p><strong>(\u00b1 5%)<\/strong><\/td>\n<\/tr>\n<tr>\n<td rowspan=\"5\" width=\"9%\">1.<\/td>\n<td rowspan=\"5\" width=\"19%\">RPM Verification<\/td>\n<td width=\"18%\">1<\/td>\n<td width=\"26%\">1000<\/td>\n<td width=\"26%\">1000 \u00b1 50 rpm<\/td>\n<\/tr>\n<tr>\n<td width=\"18%\">2<\/td>\n<td width=\"26%\">2000<\/td>\n<td width=\"26%\">2000 \u00b1 100 rpm<\/td>\n<\/tr>\n<tr>\n<td width=\"18%\">3<\/td>\n<td width=\"26%\">4000<\/td>\n<td width=\"26%\">4000 \u00b1 200 rpm<\/td>\n<\/tr>\n<tr>\n<td width=\"18%\">4<\/td>\n<td width=\"26%\">8000<\/td>\n<td width=\"26%\">8000 \u00b1 400 rpm<\/td>\n<\/tr>\n<tr>\n<td width=\"18%\">5<\/td>\n<td width=\"26%\">10000<\/td>\n<td width=\"26%\">10000 \u00b1 500 rpm<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/td>\n<td width=\"19\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"67\">5.4.3<\/td>\n<td width=\"608\">Generate the A. R. No. on the \u201cInstrument\/Equipment Calibration Register\u201d as per SOP and give requisition to QA department for calibration formats of instrument\/equipment on the due date of calibration.<\/td>\n<td width=\"19\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"67\">5.4.4<\/td>\n<td width=\"608\">For issuance of calibration report refer SOP \u201cControl of documents, Preparation, Approval, Issuance and Maintenance.<\/td>\n<td width=\"19\">&nbsp;<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><strong>\u00a0<\/strong><\/p>\n<ol start=\"6\">\n<li><strong>Definitions <\/strong><strong>\/ Abbreviations:<\/strong><\/li>\n<\/ol>\n<p><strong>\u00a0<\/strong><\/p>\n<ul>\n<li><strong>Definitions:<\/strong><\/li>\n<\/ul>\n<p><strong>\u00a0<\/strong><\/p>\n<ul>\n<li>Breakdown: Any activity leading to operation of instrument\/equipment other than the set parameters or unusual sound or vibration observed in the instrument\/equipment.<\/li>\n<li>Calibration: Tests performed to ensure that the instrument\/equipment is functioning as per set parameters. These tests are performed as per predefined frequency and also after any major repair or replacement of parts.<\/li>\n<\/ul>\n<p><strong>\u00a0<\/strong><\/p>\n<ul>\n<li><strong>Abbreviations:<\/strong><\/li>\n<\/ul>\n<p><strong>\u00a0<\/strong><strong>\u00a0<\/strong><\/p>\n<table>\n<tbody>\n<tr>\n<td width=\"116\"><strong>Abbreviation<\/strong><\/td>\n<td width=\"276\"><strong>Expansion<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"116\">SOP<\/td>\n<td width=\"276\">Standard Operating Procedure<\/td>\n<\/tr>\n<tr>\n<td width=\"116\">QC<\/td>\n<td width=\"276\">Quality Control<\/td>\n<\/tr>\n<tr>\n<td width=\"116\">QA<\/td>\n<td width=\"276\">Quality Assurance<\/td>\n<\/tr>\n<tr>\n<td width=\"116\">No.<\/td>\n<td width=\"276\">Number<\/td>\n<\/tr>\n<tr>\n<td width=\"116\">A. R. No.<\/td>\n<td width=\"276\">Analytical Reference Number<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<p><strong><em><u>*Note &#8211; Ready to use SOP available in \u201cDOWNLOAD\u201d Section.<\/u><\/em><\/strong><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>SOP Title: Operation, Cleaning and Calibration of Centrifuge Apparatus Objective: To lay down the procedure for Operation, Cleaning and Calibration of Centrifuge Apparatus. &nbsp; Scope: This SOP is applicable for Operation, Cleaning and Calibration of Centrifuge Apparatus located in Quality Control Laboratory. \u00a0 Responsibility: Quality Control: To prepare and review the SOP. To follow the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"templates\/template-full-width.php","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[],"class_list":["post-817","post","type-post","status-publish","format-standard","hentry","category-qc-sop"],"_links":{"self":[{"href":"https:\/\/pharmacoguide.com\/index.php?rest_route=\/wp\/v2\/posts\/817","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pharmacoguide.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pharmacoguide.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pharmacoguide.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/pharmacoguide.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=817"}],"version-history":[{"count":1,"href":"https:\/\/pharmacoguide.com\/index.php?rest_route=\/wp\/v2\/posts\/817\/revisions"}],"predecessor-version":[{"id":818,"href":"https:\/\/pharmacoguide.com\/index.php?rest_route=\/wp\/v2\/posts\/817\/revisions\/818"}],"wp:attachment":[{"href":"https:\/\/pharmacoguide.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=817"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pharmacoguide.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=817"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pharmacoguide.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=817"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}