{"id":779,"date":"2025-06-14T13:48:55","date_gmt":"2025-06-14T13:48:55","guid":{"rendered":"https:\/\/pharmacoguide.com\/?p=779"},"modified":"2025-06-14T13:48:55","modified_gmt":"2025-06-14T13:48:55","slug":"sop-title-operation-cleaning-and-calibration-of-vacuum-pump","status":"publish","type":"post","link":"https:\/\/pharmacoguide.com\/?p=779","title":{"rendered":"SOP Title: Operation, Cleaning and Calibration of Vacuum Pump"},"content":{"rendered":"<p><strong><u>SOP Title:<\/u><\/strong> <strong><u>Operation, Cleaning and Calibration of Vacuum Pump<\/u><\/strong><\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<ol>\n<li><strong>Objective:<\/strong><\/li>\n<\/ol>\n<p>To lay down the procedure for Operation, Cleaning and Calibration of Vacuum Pump.<\/p>\n<ol start=\"2\">\n<li><strong>Scope:<\/strong><\/li>\n<\/ol>\n<p>This SOP is applicable for Operation, Cleaning and Calibration of Vacuum Pump located in Quality Control Laboratory<\/p>\n<ol start=\"3\">\n<li><strong>Responsibility:<\/strong><\/li>\n<\/ol>\n<ul>\n<li>Quality Control: To prepare and review the SOP. To follow the procedures laid down for Operation, Cleaning and Calibration of Vacuum Pump as per this SOP.<\/li>\n<li>Engineering Department: To carry out preventive maintenance as per schedule and procedure defined.<\/li>\n<li>Quality Assurance Department: To review and approve the SOP and Annexures.<\/li>\n<\/ul>\n<ol start=\"4\">\n<li><strong>Accountability:<\/strong><\/li>\n<\/ol>\n<p>Head Quality Control Department, Head Quality Assurance Department<\/p>\n<ol start=\"5\">\n<li><strong>Procedure:<\/strong><\/li>\n<\/ol>\n<p><strong>\u00a0<\/strong><\/p>\n<table width=\"693\">\n<tbody>\n<tr>\n<td width=\"68\"><strong>\u00a0\u00a0\u00a0\u00a0 5.1<\/strong><\/td>\n<td colspan=\"2\" width=\"625\"><strong>Safety Precautions\/Instructions:<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"68\">5.1.1<\/td>\n<td width=\"607\">Ensure all the electrical connections are properly earthed. Ensure the power plug of the vacuum pump is fixed in the socket properly.<\/td>\n<td width=\"19\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"68\">5.1.2<\/td>\n<td width=\"607\">Wear personal protective equipments such as safety glasses during operation of equipment.<\/td>\n<td width=\"19\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"68\">5.1.3<\/td>\n<td width=\"607\">Ensure that the ON\/OFF switch is working properly by switching \u201cON\u201d the vacuum pump.\u00a0 <strong>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0<\/strong><\/td>\n<td width=\"19\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"68\"><strong>5.2<\/strong><\/td>\n<td colspan=\"2\" width=\"625\"><strong>Operation:<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"68\">5.2.1<\/td>\n<td width=\"607\">Check the validity of calibration before starting any operations.<\/td>\n<td width=\"19\"><strong>\u00a0<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"68\">5.2.2<\/td>\n<td width=\"607\">Ensure that the equipment should be cleaned before operation.<\/td>\n<td width=\"19\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"68\">5.2.3<\/td>\n<td width=\"607\">Connect the vacuum pump tube to the filtration assembly.<\/td>\n<td width=\"19\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"68\">5.2.4<\/td>\n<td width=\"607\">Pour the solution to be filtered into the filtration assembly.<\/td>\n<td width=\"19\"><strong>\u00a0<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"68\">5.2.5<\/td>\n<td width=\"607\">Switch ON the main switch of the equipment.<\/td>\n<td width=\"19\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"68\">5.2.6<\/td>\n<td width=\"607\">After completion of filtration put \u2018OFF\u2019 the main switch.<\/td>\n<td width=\"19\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"68\">5.2.7<\/td>\n<td width=\"607\">Disconnect the vacuum pump tube from the filtration assembly.<\/td>\n<td width=\"19\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"68\"><strong>5.3<\/strong><\/td>\n<td colspan=\"2\" width=\"625\"><strong>Cleaning Procedure:<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"68\">5.3.1<\/td>\n<td width=\"607\">Clean the vacuum pump with lint free cloth before and after use.<\/td>\n<td width=\"19\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"68\"><strong>\u00a0\u00a0 5.4<\/strong><\/td>\n<td colspan=\"2\" width=\"625\"><strong>Calibration Procedure:<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"68\"><strong>\u00a0<\/strong><\/td>\n<td colspan=\"2\" width=\"625\"><strong>Frequency: <\/strong><strong>\u00a0<\/strong>Once in a year<\/td>\n<\/tr>\n<tr>\n<td width=\"68\">5.4.1\u00a0\u00a0\u00a0\u00a0 <strong>\u00a0<\/strong><\/td>\n<td width=\"607\">Calibration is carried out by external agency as per SOP number QC\/009 \u201cCalibration of Instruments and Equipments\u201d.<\/td>\n<td width=\"19\"><strong>\u00a0<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"68\">5.4.2<\/td>\n<td width=\"607\">Refer Annexure for calibration test to be performed and acceptance criteria.<\/p>\n<table width=\"90%\">\n<tbody>\n<tr>\n<td width=\"11%\"><strong>Sr. No.<\/strong><\/td>\n<td width=\"34%\"><strong>Tests<\/strong><\/td>\n<td width=\"22%\"><strong>Set value<\/strong><\/td>\n<td width=\"31%\"><strong>Acceptance Criteria <\/strong><\/td>\n<\/tr>\n<tr>\n<td rowspan=\"6\" width=\"11%\">1.<\/td>\n<td rowspan=\"6\" width=\"34%\">Pressure Verification of vacuum gauge<\/td>\n<td width=\"22%\">0 inHg<\/td>\n<td width=\"31%\">\u00b1 2 %<\/td>\n<\/tr>\n<tr>\n<td width=\"22%\">&#8211; 5 inHg<\/td>\n<td width=\"31%\">\u00a0\u00b1 2 %<\/td>\n<\/tr>\n<tr>\n<td width=\"22%\">&#8211; 10 inHg<\/td>\n<td width=\"31%\">\u00b1 2 %<\/td>\n<\/tr>\n<tr>\n<td width=\"22%\">&#8211; 15 inHg<\/td>\n<td width=\"31%\">\u00b1 2 %<\/td>\n<\/tr>\n<tr>\n<td width=\"22%\">&#8211; 20 inHg<\/td>\n<td width=\"31%\">\u00b1 2 %<\/td>\n<\/tr>\n<tr>\n<td width=\"22%\">&#8211; 25 inHg<\/td>\n<td width=\"31%\">\u00b1 2 %<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/td>\n<td width=\"19\"><strong>\u00a0<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"68\">5.4.3<\/td>\n<td width=\"607\">Generate the A. R. No. on the \u201cInstrument\/Equipment Calibration Register\u201d as per SOP and give requisition to QA department for calibration formats of equipments on the due date of calibration.<\/td>\n<td width=\"19\"><strong>\u00a0<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"68\">5.4.4<\/td>\n<td width=\"607\">For issuance of calibration report refer SOP \u201cControl of documents, Preparation, Approval, Issuance and Maintenance.<\/td>\n<td width=\"19\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"68\">5.4.5<\/td>\n<td width=\"607\">If any breakdown occurs, follow procedure as per SOP.<\/td>\n<td width=\"19\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"68\">5.4.6<\/td>\n<td width=\"607\">If preventive maintenance activity is outsourced, the observations are to be transcribed in the Annexure, and external party certificate to be attached.<\/td>\n<td width=\"19\">&nbsp;<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><strong>\u00a0<\/strong><strong>\u00a0<\/strong><\/p>\n<ol start=\"6\">\n<li><strong>Definitions \/ <\/strong><strong>Abbreviations:<\/strong><\/li>\n<\/ol>\n<ul>\n<li><strong>Definitions:<\/strong><\/li>\n<li>Breakdown: Any activity leading to operation of instrument\/equipment other than the set parameters or unusual sound or vibration observed in the instrument\/equipment.<\/li>\n<li>Calibration: Tests performed to ensure that the instrument\/equipment is functioning as per set parameters. These tests are performed as per predefined frequency and also after any major repair or replacement of parts.<\/li>\n<li>Preventive Maintenance: Maintenance activity performed to ensure that the instrument\/equipment will function smoothly and to avoid breakdowns. These activities are performed as per predefined frequency.<\/li>\n<\/ul>\n<p><strong>\u00a0<\/strong><\/p>\n<ul>\n<li><strong>Abbreviations:<\/strong><\/li>\n<\/ul>\n<table>\n<tbody>\n<tr>\n<td width=\"116\"><strong>Abbreviation<\/strong><\/td>\n<td width=\"276\"><strong>Expansion<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"116\">No.<\/td>\n<td width=\"276\">Number<\/td>\n<\/tr>\n<tr>\n<td width=\"116\">A. R. No.<\/td>\n<td width=\"276\">Analytical Reference Number<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><strong><em><u>*Note &#8211; Ready to use SOP available in \u201cDOWNLOAD\u201d Section.<\/u><\/em><\/strong><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>SOP Title: Operation, Cleaning and Calibration of Vacuum Pump \u00a0 Objective: To lay down the procedure for Operation, Cleaning and Calibration of Vacuum Pump. Scope: This SOP is applicable for Operation, Cleaning and Calibration of Vacuum Pump located in Quality Control Laboratory Responsibility: Quality Control: To prepare and review the SOP. To follow the procedures [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"templates\/template-full-width.php","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[],"class_list":["post-779","post","type-post","status-publish","format-standard","hentry","category-qc-sop"],"_links":{"self":[{"href":"https:\/\/pharmacoguide.com\/index.php?rest_route=\/wp\/v2\/posts\/779","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pharmacoguide.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pharmacoguide.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pharmacoguide.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/pharmacoguide.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=779"}],"version-history":[{"count":1,"href":"https:\/\/pharmacoguide.com\/index.php?rest_route=\/wp\/v2\/posts\/779\/revisions"}],"predecessor-version":[{"id":780,"href":"https:\/\/pharmacoguide.com\/index.php?rest_route=\/wp\/v2\/posts\/779\/revisions\/780"}],"wp:attachment":[{"href":"https:\/\/pharmacoguide.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=779"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pharmacoguide.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=779"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pharmacoguide.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=779"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}